Technical Secretary's Queries
Q: Can a Contractor claim for time spent identifying and locating faults?
A: The NSR rates include time for competent workman to locate and identify faults. See page 2/15 para 3, headed Diagnostics.
Q: Re painting on open railings, fences & gates is it measured both sides or does the rate include for painting on both sides?
A: Painting to fencing is measure both sides.
Q: Is the NSR all in labour rate suitable for dayworks?
A: No. The build up of the NSR rate shown on page 2/11 of the Compilers notes does not include costs shown in the list on page 1/9 in part 1 of the NSR Building Works Schedule which lists profit as well as a large number of other costs which should be included in the daywork labour.
Q: Can you copy and send out sections of the Schedules to sub contractors?
A: No. This is in breach of copyright without specific permission from NSR Management.